Announcement on the Construction Tender for the Training Building Project of the First Vocational Secondary School in Yulin City

Announcement on the Construction Tender for the Training Building Project of the First Vocational Secondary School in Yulin City



The tender training project Yulin No.1 Vocational Secondary Vocational School Practical Training Building Project was approved by the Yulin Development and Reform Commission under the approval of Yufa Development Social [2015] No. 48 approval. The tenderer is the Yulin No. 1 Vocational Secondary Professional School, with construction funds. From financial allocations, the proportion of project funding is 100%. The project has already met the conditions for bidding. The project is now undergoing open bidding.

2. Project overview and scope of tender

Project Name: Yulin City First Vocational Secondary Vocational School Practical Training Building Project

Item Number: YLZC2016-G2-1519

Location: Yulin No. 1 Vocational Secondary School Campus

Construction scale: The project has a total construction area of ​​8,401.17m2, a basement area of ​​1,267.85m2, a basement floor, 8 floors above ground, a building height of 31.95m, and a frame structure.

Estimated contract price: approximately RMB 20,455,000 (finally the bid control price of the financial review shall prevail)

Request duration: 400 calendar days, fixed period 435 calendar days.

The scope of the tender: Construction projects, decoration and decoration projects, hydropower installation projects, street lamps and outdoor water supply and drainage works of the project. For details, please refer to the construction design drawings, project quantity list and tenderer's notice.

Lot segmentation: There is a total of one bid section.

3. Bidder qualification requirements

3.1 The tender requires bidders to comply with the "Interim Measures for the Management of Credit Cards in the Construction Market of Guangxi Zhuang Autonomous Region" (Guo Jian Guan [2013] No. 17) and the "Notice on Strengthening the Routine Maintenance and Management of the Credit Information Bank of Guangxi Construction Enterprises" (Guangxi) According to the provisions of Jianshe (2014) No. 25), the bank has gone through the formalities for bank deposits and is in an effective state, possessing qualifications for general contracting of construction projects of more than class ( (including class )), and having corresponding personnel, equipment, funds, etc. The construction capacity. Among them, the bidder proposes that the project manager must possess the qualification of registered construction engineer of the architectural engineering professional level (including the above grade), and have the valid Guangxi construction market integrity card and the safety production assessment certificate (B). This project does not accept construction divisions that are under construction, have not been awarded successful bids, or have been listed as the first prize winner of other projects as project managers (according to Article 16 of the Interim Measures for the Administration of the Credit Card of the Construction Market of Guangxi Zhuang Autonomous Region). Except for money).

3.2 Performance Requirements: None.

3.3 The Commonwealth does not accept bids from the Commonwealth.

3.4 All units participating in the bid for this project must obtain the bid records of the unpaid criminal files issued by the bid unit, legal representative, and project manager issued by the people's procuratorial agency before the closing of the bid, and check the original documents when submitting the bid documents.

3.5 The bidder information is based on the integrity information database of the Guangxi Construction Industry Corporation.

4. Bid registration

Those interested in participating in bidders are requested from October 9, 2016 to October 13, 2016 (excluding legal holidays, statutory holidays, etc.)
Contact: Qian Yong

Mobile:

phone

fax

E-mail:

In order to ensure that you can bid smoothly, please consult the bidding agency or the tenderer for detailed requirements for bidding before bidding or purchasing the bidding documents. The specific requirements and project conditions shall be interpreted by the bidding agency or the tenderee.